Day rate or fixed price
A day rate is fair when nobody can know the scope in advance: repairs, snagging, opening up a floor to see what is under it. You pay for time, and you carry the risk of the job taking longer.
For a defined piece of work — a wardrobe, a run of skirting, a set of doors — ask for a fixed written price instead. The carpenter then carries the risk of their own estimate, which is where it belongs. A tradesperson reluctant to fix a price for a job they have measured is telling you something.
Why day rates differ
Location is the biggest factor: London and the South East carry the highest rates in the country. After that it is experience, the type of work, and whether the carpenter brings a van full of their own tools and machinery.
Bespoke joinery is a different trade from site carpentry. A joiner making fitted furniture is usually priced by the piece rather than the day, because much of the work happens before anyone arrives on site.
What first and second fix mean
First fix is the structural work done before plastering: stud walls, floor joists, door linings, roof timbers. Second fix comes after: hanging doors, skirting, architrave, staircases and boxing in.
On an extension or loft conversion, second fix is often priced as a package rather than by the day. For a typical extension, doors, skirting and architrave together run £1,800 to £4,500.
What moves the price.
- Whether the job is measured by the day or priced as a package
- Structural requirements: spans, loadings and whether Building Control is involved
- Access, floor level and how much material has to be carried
- Timber grade and section: C24 costs more than C16 and is sometimes required
- Engineered joists versus solid timber
- Second fix specification: a good ironmongery set can cost more than the doors
- Whether we are working alongside other trades or have the site to ourselves
How to keep the cost down.
- Batch small jobs into one visit. A half-day job costs far more per hour than the same work inside a full day.
- Have materials chosen and on site before the carpenter arrives, unless they are supplying them.
- Clear and protect the work area yourself.
- For any job you can describe precisely, ask for a fixed price rather than paying by the day.
More on how we design, make and fit this work: structural carpentry in Surrey.

